Hi Can You Please Answer All 3 Question Asked By The Question?The Problem

5.18 The following processes are being scheduled using a preemptive,
priority—based, round—robin scheduling algorithm. Process Priority Burst Arrival
P1 8 15 0
P2 3 20 0
P3 4 20 20
P4 4 20 25
P5 5 5 45
P6 5 15 55 Each process is assigned a numerical priority, with a higher number indi-
cating a higher relative priority. The scheduler will execute the highest—
priority process. For processes with the same priority, a round-robin
scheduler will be used with a time quantum of 10 units. If a process is
preempted by a higher—priority process, the preempted process is placed
at the end of the queue. a. Show the scheduling order of the processes using a Gantt chart.
b. What is the turnaround time for each process? c. What is the waiting time for each process? Engineering Technology